1.2. Initial Sampling

ZEISS GUARDUS supports the whole process of initial sampling from planning and execution through version management and status administration up to the inspection report and sampling release. To configure content, not only standard forms according to VDA 2 and QS 9000 are available, but also individualized forms and requirements can be integrated in the operation by means of an integrated form designer. In case of re-sampling, characteristics already collected are automatically used including specifications such as limits test instructions or testing systems. The integration of CAD systems and measurement equipment also reduces the sampling effort considerably. The result of the initial sampling is subsequently included in the test planning. This integration secures the compliance and support of the ISO-chains. Thus, in the incoming goods tests, only initially sampled and cleared products are accepted, and only tested parts are manufactured in production.

Initial Sampling
  • Status Administration
  • Stamp Drawing
  • Support for Re-sampling
  • Releases and Versioning
  • Access to All Documents
  • Integration Drawings/CAD
  • Integration Inspection Planning
Documents you might be interested in:
  •  
    more info

    ZEISS GUARDUS supports the whole process of initial sampling from planning and execution through version management and status administration up to the inspection report and sampling release.

To the download portal